Capabilities

B-MAP Interactive Manual Procedure Schematic Window Pane

Project Definition


Execution Plan

Installation

Pre-Commissioning

Startup and Commissioning

​​Operational Readiness
Bid Packages

Functional Requirements

​​Technical Evaluation
Systems Engineering

Field Layouts

Electrical/Hydraulic/Completion Schematics

​​Equipment Requirements
Field Schematic for Subsea Production System
Flow Assurance

System Sizing

Injection Rates

​​Operating Strategy Basis
Investment Decision

System Cost

Project Schedule

​Major Risks

Commissioning Engineering
Start-Up & Intervention Support


Planning & Management

Development of Strategies and Methodologies

Management Level Budgets, Schedule, Risks and Resources

​Isolation and De-Inventory Plans
Procedure Step-by-Step Storyboard Illustration
Execution

Engagement / Training of all On-Site Personnel (including Operations)
​Site Coordination
Engineering

Temporary Equipment Definition and Procurement Support

Regulatory Permitting and Water Discharge Support

​Interface Management of 3rd Party Involvement

Flow Assurance Analysis & Operations Guidance


Gas Well Flow Assurance OLGA Simulation - Pressure Temperature Rate vs Time Graph
Steady State and Transient Analysis

Start-up and Shutdown

Warm-up and Cool-down

Blowdown and Dead Oil Circulation

Benchmarking

​Special Operations
Operations Procedure Development & Validation

HAZID and HAZOP Study Consultation

Injection Rate Determination

Traceability within Procedure for Action Closure

Initial Startup and Subsea Operating Procedures

​Subsea Operating Procedures Updates
Operating Strategy Application
Flow Assurance Operations Logic Diagram

Package Design


Hardware Specification
System General Arrangements and P&ID
Rigging Arrangements
Manifold / Skid Piping Design & Analysis
Jumper Design & Analysis
ROV Operated Subsea Intervention Skid P&ID
Subsea Production Jumper General Arrangement (GA) Drawing
Piping Flow-Induced Vibration (FIV) Analysis
Jumper Assembly & Metrology Drawings
Support for Manifold & Jumper During Fabrication, Testing and Installation:


Open Water Engineering
Installation & Intervention


Planning & Management
Field Layout and Safe Handling Areas
Pipeline Route Selections
Preliminary Pipe Sizing
Operational Sequence
​SIMOPS Planning
Engineering

Lift Analysis

ROV Access and Operability

Deck Layouts and Test Plans

Execution-Ready Procedures

​Contingency Plans
BP Atlantis PP PLEM Installation
Execution

Vendor Coordination

EFAT / SIT Oversight

Mobilization Plan and Dockside Testing

Transportation Tie-Downs & Seafastening

​Site Coordination of Execution

Other Services


Inspection, Repair and Maintenance (IRM) Risk Based Plans

ID Safety Critical Equipment and Spares

Determine Activity Frequency Based on Risk

Develop and Support IRM Program 
​
Integrity Risk Management Matrix
Tubing Hanger Running Tool and BOP Spanner Joint
Equipment Assessment & Preservation

Independent 3rd Party Review

Rig Site Inspection

Subpart H (30CRF250.801) Validation

Independent Design Verification as per BSEE Regulation
ENI K2 Subsea Tree Piping
Load Assurance
Road Transportation of Subsea Tubing Head Spool
4704 Post Oak Timber Dr.
Houston, TX  77056
​(281)-558-5200
Manatee, Inc. is registered with the Texas Board of Professional Engineers
Certificate of Registration F-4992
Copyright © 2017 Manatee, Inc.
  • Home
  • About Us
    • Capabilities
    • Experience
    • B-MAP Products
    • HSSE & Quality
    • Collaboration
  • Employment
  • Contact US